CFST says…

April 21, 2009

Toile for the architecture

Filed under: Fun, Work — Tags: , , , , , , , , , — cfst @ 8:35 pm

It has been quite a while since I updated here. Easter holiday has flew by, and the term has started again. Only the second day in and we have received two new briefs already. The first one is the usual competition brief, this year, we are asked to illustrate a design for the London Fashion WeekEnd tote bag, inspired by the theme ‘Only in London’. I have vague idea of what I want to do, but my illustrations are not great, plus my style is not the usual Tanya Ling or David Downton… so we’ll see how it turns out.

And the second project, was quite a shock actually, because first years usually don’t get 2 projects, but this one is for a boy who was stabbed in East London in August, 2008. He was due to enroll in BA fashion design with Print at CSM the same time as us, so we are creating and DIY-ing T-shirts for money raising, for the medical attention he is needed from now on, because he is paralyzed from neck down.

Anyway, enough about that, I just realised that I haven’t uploaded any photos from my Jersey Project yet, so here it goes. We had to create 6 looks in 3 weeks time, inspired by anything, but mainly to create a sillouhette. However one of the key word was body conscious, so I decided to play with that. I chose Santiage Calatrava’s Architecture because they are just amazing! And I made 7… had some extra time 🙂

So both I and Aiko modeled. Please excuse my terrible modeling 🙂
Enjoy

img_5911img_5968img_6010img_6094img_6155img_6200img_6223

Cyn

Advertisements

5 Comments »

  1. Great modelling, Cyn – not terrible at all!! I need to post these, are you able to send me some details about them over email? Fantastic work!! Denise xx

    Comment by Denise — April 21, 2009 @ 9:39 pm

  2. That’s so bad about that boy but good that your raising money for him.

    Man I wish we only got 2 projects in my first year, they gave us far too much to do at the same time.

    Love your jersey pieces!

    Comment by jenjarvis — April 26, 2009 @ 1:15 pm

    • oh no, we are having these two projects until 8th of may, we’re actually receiving our one week illustration project this week, and after 8th of may, we have to help final year, on top of three more projects until the end of term! DD: i think this is the busiest term for me XD
      thank you 🙂

      Comment by cfst — April 27, 2009 @ 7:31 am

  3. Wow these clothes are great, i love what you’ve done with jersey (am generally jersey obsessed!) Hope to play around with some too once I get an overlocker.

    Comment by KB — May 1, 2009 @ 7:24 pm

  4. hey- love your jersey work! specially the pinky one that looks like its waterfalling away from tight white inserts… I swear I saw you at Chelsea the other day (I study knit there 1st year!) well done! ^_^

    Comment by Louise — May 4, 2009 @ 8:30 pm


RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: